Here's a cool tool holder we made for a customers pullmax machine. The one on the right is the original and on the left is the one I made without the offset.
Tuesday, November 29, 2011
Saturday, November 12, 2011
Machining jobs
Pearson Customs is looking for a couple new production machining jobs for our cnc mill, if your shop can't keep up or you just want your product made in the USA give us a call or email for a quote.
Friday, November 11, 2011
Wednesday, November 9, 2011
Risers
Had to make a form tool to make the balls on these. It worked out really well without any chatter.
Tuesday, November 8, 2011
Head fixture
I've been building a new fixture for machining heads the last few days.. its almost done I just need to figure out the bolt patterns on the head to drill in the top plate.
Thursday, November 3, 2011
Narrowed Springer
Just finished up narrowing this springer by a 1.500 and keeping the same overall length, it took 20 hours to do but well worth the extra work .. its so cool looking!
Wednesday, October 19, 2011
Scooter Trash Shirts
I have some Scooter Trash shirts left over from the bike show if anyone is interested they are $15 shipped!
Monday, October 17, 2011
I'm back
Well it's been a crazy last couple months for me from getting married to a funeral and I apologize for not updating the blog. Here's a picture of the flasks I had my friends at Cycle Boys make for me.. they turned out so cool! Thanks Brent
Saturday, September 3, 2011
Thursday, August 4, 2011
Friday, July 8, 2011
Wednesday, July 6, 2011
Tuesday, June 28, 2011
Something different
Friday, June 10, 2011
Stop plates
Thursday, June 2, 2011
Black floorboards
Tuesday, May 24, 2011
BMR
Saturday, May 14, 2011
Thursday, May 5, 2011
BMR
Tuesday, May 3, 2011
Brass rocker shaft nuts
and the back side
Torque Fest
Wednesday, April 27, 2011
New Aluminum Floor Boards
Tuesday, April 5, 2011
93" Custom Shovelhead
93inch dual plugged shovelhead , Custom frame, Pearson Customs springer frontend, 200 rear tire , 4 speed trans, 3 inch primo belt drive, Crane hi4 ign., Custom pipes, S&S carb, HHI rear brake,60 spoke rims,built in passanger & highway pegs, This bike is 90% complete. It needs foot controls, a seat, new rear hub, to be wired and a gas tank. This bike is bare metal and is unfinished.Firm on price! contact 612-282-0277
Monday, April 4, 2011
Friday, April 1, 2011
So Cool..
Wednesday, March 30, 2011
Sears front end
Tuesday, March 29, 2011
Monday, March 28, 2011
Donnie Smith Show
Sunday, March 13, 2011
Good wekend on the lathe and mill
5 sets of Axle Blocks ready to be tapped..Spun up some Gas Caps and Tranny Caps on the lathe..
Also some Oil Tank ends on the mill.. Check out the half finned ones, I had to stop the machine early because these looked so cool! Stay tuned for Mr. Don Woods rockers to come to life..
Friday, March 4, 2011
Forward Controls
I had to make a new backing plate for the shift side since the old one was broke..
Always better to have three rather than one! The Brake side went really good since there was only pegs and some filing to do ..
Brake side done and ready to go
Shifter Side done and ready to go.. Notice this is set up for foot clutch and all machined to fit a xs650 clutch cable.
Tuesday, March 1, 2011
Wednesday, February 23, 2011
Spuds
Friday, February 18, 2011
Jared's Springer
Sunday, February 13, 2011
Sears castings
The castings all welded and finished ground. Next up is pressing in the neck stem and welding them in..
Thursday, February 10, 2011
1914 Sears Front end
The main castings after machining in a fixture to straighten out the legs that got bent during the casting process. Next is to make filler pieces to take up the gaps and then weld and file down smooth..
After Welding.. tomorrow I'll finish up the welding and get these ground down so I can press the neck stems in.